
Project Case
Beijing Sihuan Pharmaceutical
Yuanguangbao New-Generation BIPV Mounting System — Cost Estimate
Material Cost
0.24
CNY/W
360,000
CNY
Installation Labor Cost
0.15
CNY/W
225,000
CNY
Total Cost
585,000
CNY
On-site Welded Conventional PV Mounting System — Cost Estimate
Material Cost
0.3
CNY/W
450,000
CNY
Installation Labor Cost
0.22
CNY/W
330,000
CNY
Total Cost
780,000
CNY
Yuanguangbao New-Generation BIPV mounting system saves 195,000CNY in total cost versus the welded PV mounting system.